ActiveProcess safetyRFP-1404-071

Smart fire monitoring for storage tanks

Early leak- and fire-detection for tanks using thermal sensors and image processing.

Budget cap
4.0B Toman
Submission deadline
Jul 11, 2025
Duration
12 months
Proposals received
0 proposals

Requirement overview

Product storage tanks at Tabriz Refinery are currently monitored by periodic patrols and point detectors. The client wants an integrated system that detects leaks, vapour accumulation and hot spots before they reach a dangerous threshold, and pushes the alarm straight to the control room.

Background and rationale

Two near-miss events over the past two years showed that the gap between the start of a leak and its detection can stretch to tens of minutes. The goal is to cut that gap to under two minutes with full coverage of the tank farm.

Project objectives

  • Detect a hot spot in under 120 seconds
  • 100% coverage of the tank farm with no blind spots
  • Fewer than one false alarm per week
  • Integration with the existing DCS and fire-alarm system

Scope of work

  • Coverage study and layout of sensors and thermal cameras
  • Supply, installation and calibration of field equipment
  • Develop the image-processing software and alarm engine
  • Integrate with the control room and train operators

Expected deliverables

  • Approved coverage map and layout documentation
  • Operational system installed across all target tanks
  • Live monitoring dashboard with event logging
  • One year of support and detection-model updates

Applicant requirements

  • Experience delivering safety systems in classified areas
  • Required certifications for explosion-proof equipment
  • Resident technical team able to provide on-site support
  • Demonstrated performance at a comparable site

Evaluation criteria

  • Compliance with safety requirements and certifications25%
  • Detection accuracy and false-alarm rate40%
  • Price and maintenance cost20%
  • Quality of post-delivery support15%

Call timeline

  1. 1

    Call published

    Jun 12, 2025

    The requirement document and tank-farm layout were made available to applicants.

  2. 2

    Proposal deadline

    Jul 11, 2025

    Final deadline for uploading the technical and financial proposal.

  3. 3

    Evaluation and selection

    Jul 27, 2025

    Shortlisted proposals are presented in person and the final pick is made.

  4. 4

    Site visit

    Jun 26, 2025

    Coordinated visit to the tank farm and the control room.